NO Project Client Scope Period
1 EDC/VCM Cracking Heater With Piping For Hanwha Chemical Co. Hanwha/Korea Fabrication and Installation.
- Cracking Heater
- Piping
2004~2005
2 EDC/VCM Cracking Heater Convection & Radiant Tube Bundles (Incoloy 800H & 5Cr-1/2Mo) Hanwha / Korea Fabrication and Modularization 2005
3 YNCC NCC Revamping Work YNCC / Korea Steam Superheater Demoletion 2006
  
NO Project Client Scope Period
1 New Aromatic Complex 1-Catalystic Reformer 7-Process Heaters Yukong Ltd - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication & Installation
- Conv & Rad Section Modularization
- Refractory Lining Work with Material Supply
- Erection
1984~1985
2 Styrene Monomer Plant 2-Process Heaters Daelim Ind. Co. - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication & Installation
- Conv & Rad Section Modularization
- Refractory Lining Work with Material Supply
1985~1985
3 Chittagong Urea Fertilizer Project 1-Primary Furnace Chittagong Urea Fertilizer (Bangla-desh) - Steel Fabrication with Mat¡¯l Supply
- Partly Vendor Items Supply
1985~1986
4 60,000 BPSD Expansion Project 1-Hydrogen Reformer Furnace Hyundai Oil - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication & Installation
- Conv & Rad Section Modularization
- Refractory Lining Work with Material Supply
- Erection
1986~1987
5 2,500 MTA Chile Methanol Plant 1-Reformer Furnace Methanex Chile Ltd. (Chile) - Steel Fabrication with Mat¡¯l Supply
- Partly Refractory Lining Work with Material Supply
1986~1987
6 BTX Project 1-Aromizing Heater 5-Process Heaters SsangYong Oil - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication & Installation
- Conv Section Modularization
- Refractory Lining Work
- Erection
1989~1990
7 350,000 MTA Ethylene Complex Project 11-Naphtha Cracking Heater LG Petro. - Steel Fabrication of Heater Casing and Structure steel 1989~1990
8 350,000 MTA Naphtha Cracking Center Project 8-USC Furnace Hanhwa Chemical - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication & Installation
- Convection Section Modularization
- Refractory Lining Work with Material Supply
- Erection
- Pre commissioning
1991~1992
9 1,000 MTPD Ammonia Plant 1-Primary Reformer Furnace/Auxiliary Boiler 1-Start Up Heater Khorasan Petrochem (Iran) - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication with Mat¡¯l Supply
- Partly Refractory Lining Work with Material Supply
- Installation Work Procedure
1993~1994
10 SF Project 1-USC Furnace Hanhwa Chemical - Steel Fabrication with Mat¡¯l Supply
- Coil Fabrication & Installation
- Piping Fab. & Installation - Conv Section Modularization
- Refractory Lining Work with Material Supply
- Insulation Work with Material Supply
- TLX Exchanger
- U.S.C Quench Fitting
- Electrical & Instrum. Work - Civil & Erection Work
- Pre commissioning
1994~1995
11 Naphtha Cracking Center Modification Project 2-Naphtha Cracking Heater LG Petro - Steel Fabrication of Heater Casing and Structure steel 1995~1995
12 Octanol Project 1-Reformer Hanhwa Chemical - Steel Fabrication with Mat¡¯l Supply
- Piping Fab. & Installation
- Refractory Lining Work with Material Supply
- Insulation Work with Material Supply
- Erection Work
- Pre commissioning
1996~1997
13 HCC EDC/VCM Project EDC Pyrolysis Furnace Hanhwa Chemical - Steel Fabrication with Mat¡¯l Supply
- Piping Fab. & Installation
- Refractory Lining Work with Material Supply
- Insulation Work with Material Supply
- Erection Work
- Pre commissioning
1997~1997
14 HPC Ethylene Plant 2-Cracking Heater Honam Petrochemical - Steel Fabrication with Mat¡¯l Supply
- Piping Fab. & Installation
- Refractory Lining Work with Material Supply
- Insulation Work with Material Supply
- Erection Work
2000~2001