| 1 | 5Cr Alloy for Heater/Column Transfer Line / Revamping For Vacuum Distillation UNIT | Bechtel / France | Equipment & Piping Detail Design, Fabrication, Construction | 2003~2004 |
| 2 | Up-Front Engineering for FCCU Revamping | Reliance / India | Engineering & Planing | 2004 |
| 3 | Reliance FCCU VMP (Rg) | Reliance/India | Before shutdown Shutdown - Modification of Rx/Rg Internal & Catalyst piping(5Cr Alloy) with valve /expansion joint | 2004~2005 |
| 4 | FCCU Rx/Rg Value Maximizing Revamping ( Reactor. Catalyst piping etc ) | Reliance / India | Demolition and Installation of Catalyst piping and Installation | 2005 |
![]() |
![]() |
||||||
|
|||||||
![]() |
![]() |
| 1 | S-oil BCC PH2 | S-OIL(Korea) | FCC Equipment, Fabrication, Piping and Erection | 1994~1995 |
| 2 | FUEL OILSTORAGE TANKS & UNLOADING FACILITIES | TUAS POWER PTE, LTD(Singapore) | - DIA. 61,000 x 25,000H | 1996~1999 |
| 3 | CPC FCC | CPC(Taiwan) | RFCC Reactor & Regenerator, Steel structure Fabrication, piping & Erection. 18Units/8,193 Ton | 1999~2001 |
| 4 | 5Cr Alloy for Heater/Column Transfer Line / Revamping For Vacuum Distillation UNIT | Bechtel / France | Equipment & Piping Detail Design, Fabrication, Construction | 2000~ 2001 |